Yes, we offer pre-built and modular installation guidance for special kilns
– Pre-cured panels with interlocking edges
– Integrated anchor channels and expansion allowances
– Reduces installation time by 40% vs traditional methods
What eco-friendly practices do you follow?
100% recycled water in production
Waste heat recovery systems
Carbon offset partnerships
R&D focus on low-carbon alumina alternatives
Do you test under actual operating conditions?
We have more than 20 index tests and testing equipment. We conduct simulated service tests in our industrial-scale pilot kiln, replicating client-specific thermal cycling and atmosphere conditions.
What quality controls are implemented for your production?
Our 12-step QC process includes:
– Raw material XRF analysis.
– Semi-finished product density/porosity tests.
– Final inspection: appearance inspection, chemical index testing, cold crushing strength, thermal shock resistance (ISO 3187).
– Batch-wise sample archiving (retained for 5 years).